















|
|
| Blackburn Railway Station Blackburn
Main Contractor : Falshaws Demolition |
| |
An 18m span space frame
protection deck was installed to enable the safe demolition and removal
of the old station roof. The railway lines remained in service for
the duration of the project. |
|
|
|
<<Case Study Index
|